Heavy-duty power for Bristol's industry.
Three-phase installations, distribution upgrades, machinery connections and high-load systems for warehouses, manufacturing and waste depots. NICEIC certified.
From 250A boards to plant maintenance. We've wired it.
From Avonmouth distribution sheds to Severnside production lines, our industrial team handles three-phase installs, sub-mains upgrades, machinery connections and live-site PPM. 20+ year partnership with SUEZ R&R UK.
Six industrial specialisms. One in-house team.
Every industrial job is delivered by our own engineers. No subcontractors, no scheduling drift, no surprises when the load test comes.
Three-Phase Installs
415V three-phase supplies for new machinery, production lines and high-amp distribution boards.
Distribution Upgrades
250A and 400A board installs, sub-mains upgrades and capacity expansion as your load grows.
Machinery Connections
Hard-wired commissioning of plant, presses, conveyors and CNC. Coordinated with site shutdowns.
Planned Maintenance
PPM contracts, thermographic surveys and reactive callouts for production-critical electrical infrastructure.
Load Calculations & Surveys
Trimble-modelled load designs, fault current analysis and pre-install surveys for compliant scaling.
24/7 industrial response. Priority callout written into your contract, for sites that don't stop.
Talk to us →Sectors that don't stop.
Our industrial portfolio covers regulated, high-load environments where downtime is measured in revenue lost per hour.
Manufacturing
High-load production lines, three-phase machinery, dedicated mains and shop-floor lighting.
Warehousing & Logistics
Distribution sheds, racking lighting, dock-loader power and HGV charge bays.
Waste & Recycling
20+ years with SUEZ: high-amp depots, sorting plant electrics and fleet bays.
Energy & Utilities
Substations, generators, switchgear and three-phase grid feeds for utility-scale sites.